BMW 7 Owners & Service Manuals

BMW 7 Series: Air Cleaner

REPLACING BOTH AIR FILTER ELEMENTS (N63)

Necessary preliminary tasks:

  • Turn off ignition
  • Remove ACOUSTIC COVER

NOTE: Description relates to the left intake filter housing. Procedure for the right side is identical.

Release clamp (1).

Tightening torque 13 62 9AZ.

Disconnect plug (2) on air-mass sensor.

Air Cleaner
Fig. 128: Identifying Air-Mass Sensor Plug And Mounting Clamps

Release screws along line (1).

Tightening torque 13 62 8AZ.

Remove air filter cover (2).

Air Cleaner
Fig. 129: Identifying Air Filter Cover With Mounting Screws

Remove air filter insert.

Installation: Clean upper and lower sections of intake filter housing from inside.

Replacing air filter element.

Replacing both air filter elements (N63)

Air Cleaner
Fig. 130: Identifying Air Filter

    READ NEXT:

     Carbon Canister Ventilation

    REPLACING TANK VENTING VALVE (N63) Necessary preliminary tasks Check stored fault message. Switch off ignition. Remove FAN COWL. Unlock connector (1) and remove. Unlock hose (2) and detach. Unl

     Gear Shift Mechanism

    GEAR SHIFT MECHANISM PRECAUTIONARY MEASURES ON VEHICLES WITH ACTIVE PEDESTRIAN PROTECTION SYSTEM WARNING: Danger to life! Triggering the active pedestrian protection system while the engine compartme

     Electrical System

    Electrical System - Operating Fluids 1.0 BATTERY Only distilled water (available locally) is to be used when topping up the electrolyte level. If a new battery (delivered dry) is to be placed into s

    SEE MORE:

     Removing And Installing Fan Housing For Heater/Air Conditioner Fan

    Necessary preliminary tasks Remove RIGHT/REAR SUSPENSION CROSS-BRACE. REMOVE auxiliary E box Unlock plug connection (1) on AUC sensor (2) and disconnect. Fig. 8: Identifying Lock Plug Connection On AUC Sensor Release screws (1) on fan housing cover (2). Lift out fan housing cover. Fig. 9: Ide

     Removing And Installing Three-Hole Flange

    Notes IMPORTANT: It is absolutely necessary to replace the sunk nut! The sunk nut already has a screw locking. After the propeller shaft has been screwed into the rear axle final drive (sunk nut), a hardening time of at least 2 hours is absolutely necessary. The hardening time may be extended at l

    © 2019-2025 Copyright www.bmw7g11.com