BMW 7 Series: Bonding On Painted Surfaces
IMPORTANT: Conform with safety regulations.
Overview of topics
- Equipment
- Expiry date of consumables
- Preparation of surface
- Bonding coat
- Hardening times
- Subsequent treatment
- Disposing of adhesive
1.0 Equipment
- CLEANER R1
- Adhesive as specified in repair instructions
- CARTRIDGE GUN
2.0 Expiry date of consumables
- Glue cartridge is marked with a date.
- Do not use adhesive after this date.
3.0 Preparation of surface
3.1 Preparation of surface on vehicle
3.2 Preparation of surface on new part
4.0 Adhesive application
- Processing temperature of glue cartridge 18ºC - 30ºC.
- Object temperature, vehicle and new parts, min. 15ºC.
- Do not use any compressed-air-operated cartridge guns.
- Insert glue cartridge in cartridge gun, remove cap and allow both
adhesive components to emerge. Strip
adhesive components uniformly and attach mixing tube.
- Allow approx. 10 cm of mixed adhesive to emerge and then apply the mixed
adhesive first on one side of
the bonding surface.
- After applying the adhesive, check whether an adhesive component has
emerged at the back of the
cartridge. If yes, break off the bonding procedure. Clean new part. Use new
glue cartridge. Contact
national hotline.
- Potlife of mixed adhesive approx. 2 hours. A change of mixer is only
necessary if over a period of 30
minutes no material has flowed through the mixer.
- Join components and secure in position.
- Remove excess adhesive.
5.0 Hardening times
- Do not move the vehicle before the adhesive has hardened.
Check the degree of hardness of the adhesive with a fingernail.
If the adhesive cannot be pressed in any further with a fingernail, the
vehicle may be moved (without
engine force) for further processing applications (e.g. painting).
- Vehicle strength for driving applications is achieved after:
48 hours at min. 15ºC object temperature (corresponding to approx. 18ºC room
temperature).
or 1 hour in the spray booth (spray booth temperature 80ºC/object
temperature 60ºC).
- When using radiant heaters, make sure that the object temperature does
not exceed 85ºC.
Excessively high temperatures will destroy the adhesive.
- Remove contamination caused by adhesive residue immediately.
Hardened adhesive can only be removed mechanically.
6.0 Subsequent treatment
- Reseal areas which are cavity-sealed as standard.
7.0 Disposing of adhesive
- Hardened adhesive is disposed of as normal waste.
- Empty glue cartridges are disposed of as normal waste.
- Non-hardened adhesives and mixtures of adhesive and solvent and the like
must be disposed of as
hazardous waste.
These regulations apply to the Federal Republic of Germany.
For other countries, comply with the (possibly differing) nationally applicable
regulations.
READ NEXT:
IMPORTANT: Conform with safety regulations.
Overview of topics
Equipment
Preparing the surface
Bonding coat
Hardening times
Subsequent treatment
1.0 Equipment
Sandpaper
CLEANING AGENT R1
AD
NOTE: Following repairs, the corrosion protection work already begins with
the correct
removal of the PVC undercoating, anti-drumming layer and seam seals.
The PRODUCTS RECOMMENDED by BMW are optimiz
For acoustic insulation reasons insulating foam is applied to the
finish-painted bodyshell in the bulkhead crossmember
area.
A 2-component PU cavity foam is used.
Sourcing reference for cavity foam
SEE MORE:
Light in the exterior mirror
Prewarning
The dimmed light in the exterior mirror indicates
when there are vehicles in the blind spot or approaching
from behind.
Acute warning
When the turn signal is switched on while a vehicle
is in the critical zone, the steering wheel vibrates
briefly and the lig
General information
The low beams stay illuminated for a particular
time if the high beams are switched on after the
drive-ready state is switched off.
Setting the duration
Via iDrive:
"CAR"
"Settings"
"Exterior lighting"
"Pathway lighting"
Select the desired setting.
"OK"
Daytime runn