Observe procedure for REPAIR STAGE 3.
Read contents of BODY, GENERAL.
Following new body parts are required:
B-pillar with entrance
Fig. 251: Identifying B-Pillar With Entrance
Fig. 252: Identi
Procedure OBSERVE repair stage 3! Read contents of BODY, GENERAL.
Spot-weld bonding is used on this vehicle. Observe specific procedure.
Place vehicle on straightening bench.
Following new body par
REMOVING AND INSTALLING OR REPLACING BRAKE BOOSTER
Necessary preliminary tasks
Read and comply with GENERAL INFORMATION
Remove rear left DOME CROSS-BRACE
Remove left footwell trim
On vehicles with coolant expansion tank in side panel, front left:
Remove coolant filler neck
After completing
Notes
IMPORTANT: It is absolutely necessary to replace the sunk nut!
The sunk nut already has a screw locking.
After the propeller shaft has been screwed into the rear axle final drive (sunk
nut), a hardening time of at least 2 hours is absolutely necessary.
The hardening time may be extended at l