Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
NOTE: Do not connect the charger to the 12 V charging socket.
The 12 V charging socket is supplied with voltage by the rear power
distribution box via relay. This relay drops
out after terminal 15 OFF. This means that a trickle charger connected at the 12
V charging socket will be
disconnected fro
IMPORTANT: Conform with safety regulations.
Overview of topics
Equipment
Expiry date of consumables
Preparation of surface
Bonding coat
Hardening times
Subsequent treatment
Disposing of adhesive
1.0 Equipment
CLEANER R1
Adhesive as specified in repair instructions
CARTRIDGE GUN
2.0 Exp