Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
Instrument Cluster Test Functions
The test functions are shown in the TFT display of the instrument cluster.
To Start Function Test
Terminal R ON or terminal 15 ON.
Press and hold the reset button in the instrument cluster for 10 seconds
(set/reset).
or
by holding down the setting button in
Special tools required:
11 7 201
22 13 485
Necessary preliminary tasks:
Drain engine oil.
Remove flywheel.
Remove bottom of oil sump.
NOTE: Support bush (2) is included in delivery specification.
If the crankshaft seal (1) is stored for more than six months without the
support sleeve (2),