Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
Notes
WARNING: Danger of scalding!
Open sealing cap only after engine has cooled down.
IMPORTANT: Cooling system for intercooler has a separate cooling circuit.
Coolant is added at intercooler expansion tank.
Electric coolant pump!
FOLLOW INSTRUCTIONS FOR WORKING ON COOLING SYSTEM.
IMPORTANT: Life
Notes
IMPORTANT: Risk of damage to sealing lip on valve stem seal.
Fit new valve stem seals only when all valves have been installed.
Necessary preliminary work
Remove all VALVE SPRINGS.
Press special tool 11 6 370 onto the valve stem seal.
Withdraw valve stem seal by turning and simultaneously