Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
Notes
IMPORTANT: The timing can only be checked with special tool 11 9 900.
The timing may be misinterpreted if it is checked without special tool 11 9 900.
Cylinders 5-8:
Necessary preliminary work
Remove left CYLINDER HEAD COVER
Remove FAN COWL with electric fan
Remove BELT PULLEY for air con
REPLACING ALL RUBBER MOUNTS FOR REAR AXLE SUPPORT
Notes
IMPORTANT: Before removing rear axle support:
In order to avoid damage to vehicle hoist, perform weight compensation on
vehicle.
Load luggage compartment with sand bags.
Necessary preliminary work
Remove REAR AXLE SUPPORT
IMPORTANT: Risk of