Notes
NOTE: Carry out the work steps listed when:
Installing a new or replacement transmission.
Flushing can only be carried out with the automatic transmission removed.
Procedure
Automatic transmiss
Necessary preliminary tasks
Remove front right WHEEL ARCH TRIM.
WARNING: Danger of scalding!
Only perform this work after engine has cooled down.
IMPORTANT: Wear protective goggles and gloves.
IMPO
NOTE: Ride height adjustment must be carried out after the following work:
Removal/replacement of ride height sensor or its control rod (only
necessary for vehicles with air suspension or vehicles with VDC)
Replacement of wiring harness
Replacement of air supply system control unit (F01/F02/F04
Notes
IMPORTANT: Both coil springs on the relevant axle must be replaced only in
the event of
corrosion breakage!
The coil spring is allocated in the Electronic Parts Catalogue (EPC) under
the menu item "Spring table" after the
vehicle identification number has been entered and the relevant option