BMW 7 Owners & Service Manuals
BMW 7 Series (F01/F02) 2008-2015 Service Manual / Engine Electrical System / Engine Wiring Loom / Replacing Wiring Harness Section For Ignition And Injectors (N63)

BMW 7 Series: Replacing Wiring Harness Section For Ignition And Injectors (N63)

IMPORTANT: Read and comply with notes on protection against damage from electrostatic damage (ESD protection).

Necessary preliminary work

  • Read out the fault memory of the DME control unit.
  • Switch off ignition.
  • Disconnect BATTERY EARTH LEAD.
  • Remove left and right INTAKE SILENCER HOUSINGS.
  • Remove intake duct on left and right.
  • Partially release WIRING HARNESS for engine.

Release screws (1).

Tightening torque 12 90 2AZ.

Remove electronics box cover (2).

Engine Wiring Loom
Fig. 99: Identifying Electronics Box Cover And Screws

Unlock all connectors (1) from control unit and disconnect.

Unclip grommet hold-down device (2) and remove.

Detach rubber grommets (3) from electronics box. Place wiring harnesses to the side.

Installation note: Make sure grommets are correctly fitted (watertightness).

Engine Wiring Loom
Fig. 100: Identifying Control Unit Connectors, Grommet Hold-Down Device And Electronics Box Rubber Grommets

Release clamps (1) and (2).

Replace clamps (2).

Detach both charge-air ducts (3) and remove.

Check the gaskets on the exhaust turbocharger. replacing if necessary.

Engine Wiring Loom
Fig. 101: Identifying Charge-Air Ducts And Clamps

Picture shows the left side, the procedure for the right side is identical.

Detach hoses (1) from clean-air pipe.

Release screw (2).

Tightening torque 13 71 1AZ.

Detach clean-air pipe (3) in direction of travel from exhaust turbocharger.

Check the gasket on the clean air pipe. replacing if necessary.

Engine Wiring Loom
 Fig. 102: Identifying Clean-Air Pipe, Hoses And Screw

Release screws (1).

Tightening torque 12 51 2AZ.

Unlock plugs on injectors and ignition coils and detach.

Release wiring harness (2).

Release wiring harness (3) and lay to one side.

Engine Wiring Loom
Fig. 103: Identifying Screws, Wiring Harness And Wiring Loom

Release screw (1).

Tightening torque 12 51 2AZ.

Raise cable duct (2).

Engine Wiring Loom
Fig. 104: Identifying Cable Duct And Screw

Pull off cable duct (1) from cable clip (2) in upward direction.

Cable (3) does not have to be released.

Engine Wiring Loom
Fig. 105: Identifying Cable Duct, Cable Holder And Holder Cable

Release screws (1).

Tightening torque 12 51 2AZ.

Raise cable duct (2).

Engine Wiring Loom
 Fig. 106: Identifying Cable Duct And Screw

Release screws (1).

Tightening torque 12 51 2AZ.

Release screw (2).

Unlock plugs on injectors and ignition coils and detach.

Lay wiring harness (3) to one side.

Feed out air wiring harness (4) and remove.

Engine Wiring Loom
Fig. 107: Identifying Screw, Wiring Harness And Wiring Loom

NOTE: Check wiring harness installation arrangement.

Check plug connections for correct fit.

Check stored fault message.

Delete fault memory.

    READ NEXT:

     Oil Pressure/Oil Temperature/Oil Gauge

    REMOVING AND INSTALLING/REPLACING OIL LEVEL SENSOR FOR ENGINE OIL (N63) IMPORTANT: Read and comply with notes on protection against damage from electrostatic discharge (ESD protection). Necessary pre

     Control Unit Box

    REMOVING AND INSTALLING/REPLACING ELECTRONICS BOX IMPORTANT: Read and comply with notes on protection against electrostatic damage (ESD protection). NOTE: Follow instructions for removing and install

     Information & Communications

    SEE MORE:

     Steptronic transmission

    Concept The Steptronic transmission combines the functions of an automatic transmission with the possibility of manual shifting, if needed. Safety information Warning An unsecured vehicle can begin to move and possibly roll away. There is a risk of accident. Before exiting, secure the vehicle agai

     Replace Luggage Compartment Floor And Both Side Members (Tail Panel Trim Removed)

    Read contents of BODY, GENERAL. STRIP DOWN VEHICLE. Place vehicle on straightening bench. These repair instructions comprise the procedures for REPAIR STAGE 3. Following new body parts are required: Luggage compartment floor, rear Side member, left and right Extension, side member, left and

    © 2019-2024 Copyright www.bmw7g11.com