SEE MORE:
NOTE: Owing to the different engine variants and equipment specifications,
not all the
components are taken into consideration.
The following list basically represents the removal sequence.
Disconnect battery earth lead (job number: 61 20 900)
Remove bumper trim (job number: 51 11 156
Remove bu
Necessary preliminary tasks
Remove WHEELS.
Checking thickness difference:
Measure thickness difference within brake surfaces at 8 point (spread
over the circumference) with a
micrometer gauge
Compare measurement result with setpoint value.
Fig. 6: Measuring Thickness Difference Within Bra