Notes
IMPORTANT: All adjusting procedures on the chain drive must be observed.
A timing chain which is tensioned too tautly can cause noises in the chain
drive.
A timing chain that is too slack can
Special tools required:
11 7 201
22 13 485
Necessary preliminary tasks:
Drain engine oil.
Remove flywheel.
Remove bottom of oil sump.
NOTE: Support bush (2) is included in delivery specificat
OIL RETURN COVER
IMPORTANT: Risk of fire.
In the event of oil leakage in the Vee, the leakage oil may be ignited on hot
components.
Necessary preliminary work
Remove both exhaust turbochargers.
R
BMW ASSIST Menu
The "Vehicle Info" menu contains all the information regarding the condition,
service intervals, the on-board
computer and the journey computer of the vehicle.
In addition, this menu contains for the first time a Quick Guide and the
electronic Owner's Handbook for the
vehicle.
NOT
Notes
WARNING: Burning hazard! Wear gloves.
Necessary preliminary work
Remove lower TIMING CASE COVER
To facilitate removal and installation of timing chains, turn engine
over with special tool 00 2 300.
Timing drive, cylinders 1 to 4
Remove guide rail (5) from bearing bolt.
Remove timing cha