BMW 7 Owners & Service Manuals

BMW 7 Series: Air Conditioning System

READ NEXT:

 A/C Performance Test (R 134a)

Observe the following conditions prior to the A/C performance test 1. Provision of a diagnosis system. Safeguard electrical system integrity by checking the fault memory (no faults in the fault memor

 Drawing Off, Evacuating And Filling Heating And Air Conditioning System (R 134a)

WARNING: Only persons in possession of a professional certificate of competence for the maintenance and repair of heating and air conditioning systems are authorized to carry out repair work on the

 Instructions For Handling R 134a Refrigerant

Work on the refrigerant circuit may only be carried out by experts! Avoid all contact with liquid or gaseous R 134a. Wear safety goggles and gloves when working on the refrigerant circuit. Follow S

SEE MORE:

 Removing And Installing Three-Hole Flange

Notes IMPORTANT: It is absolutely necessary to replace the sunk nut! The sunk nut already has a screw locking. After the propeller shaft has been screwed into the rear axle final drive (sunk nut), a hardening time of at least 2 hours is absolutely necessary. The hardening time may be extended at l

 Filling Bulkhead Cross-Member With Foam

For acoustic insulation reasons insulating foam is applied to the finish-painted bodyshell in the bulkhead crossmember area. A 2-component PU cavity foam is used. Sourcing reference for cavity foam, refer to BMW Parts Department. Observe SAFETY AND APPLICATION INSTRUCTIONS. Fig. 7: Identifying